| Material Type Group | Material Type Description | LAP Exception |
|
Aggregate
|
Aggregate Base Course - E
|
When placement is on Greenway or Multi-Use Path density requirement is 92% for Nuclear or Conventional method
|
|
Asphalt
|
Asphalt Bases & Pavements - E
|
Form 610-9 revised mix per QMS. When placement is on Greenway or Multi-Use Path compaction - 85% every 5,000 ft, minimum of one per project
|
|
Concrete
|
Concrete, Class A - E
|
On-site sampling, testing, cylinders shall be conducted on every day concrete is placed, regardless amount of concrete, mix design, or design strength.Form 903 shall be fully completed (top & bottom), and documented to the associated line item(s).
|
|
Concrete
|
Concrete, Class AA - E
|
On-site sampling, testing, cylinders shall be conducted on every day concrete is placed, regardless amount of concrete, mix design, or design strength.Form 903 shall be fully completed (top & bottom), and documented to the associated line item(s).
|
|
Concrete
|
Concrete, Class B - E
|
On-site sampling, testing, cylinders shall be conducted on every day concrete is placed, regardless amount of concrete, mix design, or design strength.Form 903 shall be fully completed (top & bottom), and documented to the associated line item(s).
|
|
Fencing Materials
|
Fence Post, Metal - B
|
Type 6 certification and Buy America required. Ornamental fencing approved by Municipality. Split rail fencing may be purchased from local sources.
|
|
Fencing Materials
|
Fencing Accessories - B
|
Type 6 certification and Buy America required. Ornamental fencing approved by Municipality. Split rail fencing may be purchased from local sources.
|
|
Fencing Materials
|
Fencing Fabric, Woven Wire - E
|
Type 1 or Type 4 certification and Buy America required. Ornamental fencing approved by Municipality. Split rail fencing may be purchased from local sources.
|
|
Fencing Materials
|
Fencing Fabric/Wire - E
|
Type 1 or Type 4 certification and Buy America required. Ornamental fencing approved by Municipality. Split rail fencing may be purchased from local sources.
|
|
Fencing Materials
|
Fencing Wire, Barbed - E
|
Type 6 certification and Buy America required. Ornamental fencing approved by Municipality. Split rail fencing may be purchased from local sources.
|
|
Grading
|
Borrow Material For Quality - E
|
Sample required if Borrow is not from an approved source. Minimum of one embankment density and one subgrade density per project. Embankment should meet 90%, subgrade 92%.
|
|
Grading
|
Earthwork Excavations - Borrow - E
|
Sample required if Borrow is not from an approved source. Minimum of one embankment density and one subgrade density per project. Embankment should meet 90%, subgrade 92%.
|
|
Grading
|
Embankment from Unclassified - E
|
Sample required if Borrow is not from an approved source. Minimum of one embankment density and one subgrade density per project. Embankment should meet 90%, subgrade 92%.
|
|
Grading
|
Rock Embankment (Cubic Yards) - E
|
Sample required if Borrow is not from an approved source. Minimum of one embankment density and one subgrade density per project. Embankment should meet 90%, subgrade 92%.
|
|
Grading
|
Rock Embankment (Tons) - E
|
Sample required if Borrow is not from an approved source. Minimum of one embankment density and one subgrade density per project. Embankment should meet 90%, subgrade 92%.
|
|
Grading
|
Subgrade - B
|
Sample required if Borrow is not from an approved source. Minimum of one embankment density and one subgrade density per project. Embankment should meet 90%, subgrade 92%.
|
|
Grading
|
Subgrade - E
|
Sample required if Borrow is not from an approved source. Minimum of one embankment density and one subgrade density per project. Embankment should meet 90%, subgrade 92%.
|
|
Guardrail
|
Guardrail Anchor Cable - B
|
When placement is not adjacent to vehicle traffic, must come from approved producer, verify Heat numbers, no FIR required.
|
|
Guardrail
|
Guardrail Anchor Unit - B
|
When placement is not adjacent to vehicle traffic, must come from approved producer, verify Heat numbers, no FIR required.
|
|
Guardrail
|
Guardrail Anchor Unit - Chemical Check - B
|
When placement is not adjacent to vehicle traffic, must come from approved producer, verify Heat numbers, no FIR required.
|
|
Guardrail
|
Guardrail Backup Plates - B
|
When placement is not adjacent to vehicle traffic, must come from approved producer, verify Heat numbers, no FIR required.
|
|
Guardrail
|
Guardrail, Aluminum Beam - E
|
When placement is not adjacent to vehicle traffic, must come from approved producer, verify Heat numbers, no FIR required.
|
|
Guardrail
|
Guardrail, Hardware - B
|
When placement is not adjacent to vehicle traffic, must come from approved producer, verify Heat numbers, no FIR required.
|
|
Guardrail
|
Guardrail, Plastic Block - B
|
When placement is not adjacent to vehicle traffic, must come from approved producer, verify Heat numbers, no FIR required.
|
|
Guardrail
|
Guardrail, Steel Beam - B
|
When placement is not adjacent to vehicle traffic, must come from approved producer, verify Heat numbers, no FIR required.
|
|
Guardrail
|
Guardrail, Steel Beam - E
|
When placement is not adjacent to vehicle traffic, must come from approved producer, verify Heat numbers, no FIR required.
|
|
Guardrail
|
Guardrail, Steel Post & Block - B
|
When placement is not adjacent to vehicle traffic, must come from approved producer, verify Heat numbers, no FIR required.
|
|
Guardrail
|
Guiderail, Cable - E
|
When placement is not adjacent to vehicle traffic, must come from approved producer, verify Heat numbers, no FIR required.
|
|
Guardrail
|
Guiderail, Cable, Hardware - B
|
When placement is not adjacent to vehicle traffic, must come from approved producer, verify Heat numbers, no FIR required.
|
|
Guardrail
|
Temporary Steel Beam Guardrail Terminal Sections - B
|
When placement is not adjacent to vehicle traffic, must come from approved producer, verify Heat numbers, no FIR required.
|
|
LIghting and Elect.
|
Light Standard, High Mount - B
|
Submittals should be reviewed by NCDOT and/or Municipality for compatibility with existing infrastructure
|
|
LIghting and Elect.
|
Lighting and Electrical Materials - B
|
Submittals should be reviewed by NCDOT and/or Municipality for compatibility with existing infrastructure
|
|
LIghting and Elect.
|
Lighting and Electrical Materials - E
|
Submittals should be reviewed by NCDOT and/or Municipality for compatibility with existing infrastructure
|
|
Signal
|
Traffic Signal Materials - B
|
Submittals should be reviewed by NCDOT and/or Municipality for compatibility with existing infrastructure
|
|
Signal
|
Traffic Signal Materials - E
|
Submittals should be reviewed by NCDOT and/or Municipality for compatibility with existing infrastructure
|
|
Utilities
|
Pipe, Utility, ABS - E
|
Submittals should be reviewed by NCDOT and/or Municipality for compatibility with existing infrastructure
|
|
Utilities
|
Pipe, Utility, ABS - M
|
Submittals should be reviewed by NCDOT and/or Municipality for compatibility with existing infrastructure
|
|
Utilities
|
Pipe, Utility, Accessories - B
|
Submittals should be reviewed by NCDOT and/or Municipality for compatibility with existing infrastructure
|
|
Utilities
|
Pipe, Utility, Accessories - E
|
Submittals should be reviewed by NCDOT and/or Municipality for compatibility with existing infrastructure
|
|
Utilities
|
Pipe, Utility, Accessories - M
|
Submittals should be reviewed by NCDOT and/or Municipality for compatibility with existing infrastructure
|
|
Utilities
|
Pipe, Utility, Ductile Iron - E
|
Submittals should be reviewed by NCDOT and/or Municipality for compatibility with existing infrastructure
|
|
Utilities
|
Pipe, Utility, Ductile Iron - M
|
Submittals should be reviewed by NCDOT and/or Municipality for compatibility with existing infrastructure
|
|
Utilities
|
Pipe, Utility, Ductile Iron, Fittings - E
|
Submittals should be reviewed by NCDOT and/or Municipality for compatibility with existing infrastructure
|
|
Utilities
|
Pipe, Utility, Ductile Iron, Fittings - M
|
Submittals should be reviewed by NCDOT and/or Municipality for compatibility with existing infrastructure
|
|
Utilities
|
Pipe, Utility, Polyethylene - E
|
Submittals should be reviewed by NCDOT and/or Municipality for compatibility with existing infrastructure
|
|
Utilities
|
Pipe, Utility, Polyethylene - M
|
Submittals should be reviewed by NCDOT and/or Municipality for compatibility with existing infrastructure
|
|
Utilities
|
Pipe, Utility, PVC - E
|
Submittals should be reviewed by NCDOT and/or Municipality for compatibility with existing infrastructure
|
|
Utilities
|
Pipe, Utility, PVC - M
|
Submittals should be reviewed by NCDOT and/or Municipality for compatibility with existing infrastructure
|
|
Utilities
|
Pipe, Utility, Steel - E
|
Submittals should be reviewed by NCDOT and/or Municipality for compatibility with existing infrastructure
|
|
Utilities
|
Pipe, Water, Copper - E
|
Submittals should be reviewed by NCDOT and/or Municipality for compatibility with existing infrastructure
|
|
Utilities
|
Pipe, Water, Copper - M
|
Submittals should be reviewed by NCDOT and/or Municipality for compatibility with existing infrastructure
|
|
Utilities
|
Pipe, Water, Polyethylene - E
|
Submittals should be reviewed by NCDOT and/or Municipality for compatibility with existing infrastructure
|
|
Utilities
|
Pipe, Water, Polyethylene - M
|
Submittals should be reviewed by NCDOT and/or Municipality for compatibility with existing infrastructure
|
|
Number of Records: 53
|